Geothermal Heat Pump Retrofit Installation
What follows is an example of a 3-ton system with (2) 220-foot vertical loops, which took the driller two days to install.
Find out more:
|
|
5. Inside sealed
|
6. Flow Center installed
|
7. Heat pump installed
|